0301 E2 Production 2: Well completion and subsea

Training

Online

£ 384 VAT inc.

Description

  • Type

    Training

  • Level

    Intermediate

  • Methodology

    Online

  • Duration

    Flexible

  • Start date

    Different dates available

Personnel who plan, complete, set into production or perform maintenance on injection on production
wells offshore. Personnel in staff function onshore or personnel supplying equipment or services to
various well operations are included in the target group for this course.

Facilities

Location

Start date

Online

Start date

Different dates availableEnrolment now open

About this course

After completing the course the student should be able to participate in the planning and executing of
the design of injection and production wells as well as selecting equipment and methods. They should
also be able to describe the methods and equipment required to start production from sub-sea
completed wells. Furthermore they will be able to explain the requirements for well maintenance and
safety on various types of well operations.

Introduction courses or relevant professional background.

This web based course is in accordance with the guidelines from The Norwegian Oil Industry
Association and covers the official Norwegian syllabus for Technical College, Petroleum Technology
Faculty. The course is equivalent to 74 hours of ordinary tuition in this subject

Questions & Answers

Add your question

Our advisors and other users will be able to reply to you

Who would you like to address this question to?

Fill in your details to get a reply

We will only publish your name and question

Reviews

Subjects

  • Construction
  • Construction Training
  • Personnel
  • Production
  • Maintenance
  • Operations
  • Well Completion
  • Positioning
  • Injection intervals
  • Perforated liners
  • Intelligent completions
  • Tail pipe
  • Valves

Course programme

Course content:

Well design and construction and alternative choices:

Standard construction of a well

Highly deviated wells

Intelligent completions

Multi-lateral wells

Production and injection intervals

Cemented and perforated liners

Open hole completions

Standard construction

Tail pipe

Packer types

Valves

Installation and positioning of profiles

0301 E2 Production 2: Well completion and subsea

£ 384 VAT inc.