Subsea power cables

Course

In London

£ 0

Description

  • Type

    Course

  • Level

    Advanced

  • Location

    London

  • Class hours

    14h

  • Duration

    2 Days

This technical awareness course details the cycles and phases in the installation of subsea power cables. Explaining various installation methods using surface laying, ploughing and ROV burial, including pull into offshore structures and landfalls.

Facilities

Location

Start date

London
See map

Start date

On request

About this course

It helps installation contractors, engineers, project managers and oil and gas practitioners transferring to the offshore wind industry deepen their knowledge of the subject

Questions & Answers

Add your question

Our advisors and other users will be able to reply to you

Who would you like to address this question to?

Fill in your details to get a reply

We will only publish your name and question

Reviews

Subjects

  • Oil and Gas
  • Subsea systems
  • Subsea equipment
  • Installation
  • Design
  • Power Engineering
  • Subsea controls
  • Oil Engineering
  • Engineering
  • Subsea pipelines

Teachers and trainers (1)

Dave Slee

Dave Slee

Tutor

Course programme

  • Typical project structure
  • Feasibility studies
  • Consenting
  • Environmental impact studies
  • Surveys
  • Route selection
  • Cable production
  • Installation
  • Post-lay activities
  • Case study – Part 1: Overview


Cable routing

  • Selection of route corridor
  • Geophysical survey
  • Route determination
  • Charting
  • Geotechnical survey
  • Burial methods
  • Burial performance prediction
  • Case study – Part 2: Routing


Cable design

  • Cable types for array
  • Export and interconnectors
  • Design qualification
  • Cable performance characteristics
  • Hauling devices and joints
  • Case study – Part 3: Design

Cable installation

  • Pre-installation design and analysis
  • Types of vessel
  • Deck layouts and key installation equipment
  • Surface laying
  • Plough burial
  • ROV burial
  • Other types of burial
  • Rock dumping
  • Case study – Part 4: Installation

Offshore structure connection

  • Cable entry types
  • Entry protection
  • Internal cable management
  • Pull-in analysis
  • Installation equipment and methods
  • Case study – Part 5: Connections

Landfalls

  • Landfall selection
  • Horizontal directional drilled installation process
  • Surface lay and trenched process
  • Landfall joint bay
  • Case study – Part 6: Landfalls

Additional information

For more information, visit www.jee.co.uk

Subsea power cables

£ 0