Cost Management - CM

Course

In San Francisco (USA)

Price on request

Description

  • Type

    Course

  • Location

    San francisco (USA)

  • Start date

    Different dates available

Introduction to artificial lift and electrical submersible pumping; Introduction for reservoir and production considerations; Description of all components of the electrical submersible system starting at the surface to the pump; transformers; controllers/VSD; wellhead; tubing cable; cable guards; motor lead cable; pump; intake/gas separator; equalizer/protector; motor; instrumentation; Installation considerations and cautions; Design of an ESP system to fit current and future well conditions; Operation of a given design; Analysis of an ESP system using diagnostics from installed instrumentation and using diagnostic computer programs; Removal of failed equipment; Controls for ESP systems including variable speed drives; ESP instrumentation available in the industry; Failure analysis; Data keeping; Maintenance and Monitoring

Facilities

Location

Start date

San Francisco (USA)
See map
333 Bush Street, Suite 2400, 94104

Start date

Different dates availableEnrolment now open

Questions & Answers

Add your question

Our advisors and other users will be able to reply to you

Who would you like to address this question to?

Fill in your details to get a reply

We will only publish your name and question

Reviews

Subjects

  • Design
  • Electrical
  • Systems
  • Industry
  • Gas
  • Installation
  • Production
  • Monitoring
  • Management
  • IT Management

Course programme

Training Course Content

Introduction to artificial lift and electrical submersible pumping; Introduction for reservoir and production considerations; Description of all components of the electrical submersible system starting at the surface to the pump; transformers; controllers/VSD; wellhead; tubing cable; cable guards; motor lead cable; pump; intake/gas separator; equalizer/protector; motor; instrumentation; Installation considerations and cautions; Design of an ESP system to fit current and future well conditions; Operation of a given design; Analysis of an ESP system using diagnostics from installed instrumentation and using diagnostic computer programs; Removal of failed equipment; Controls for ESP systems including variable speed drives; ESP instrumentation available in the industry; Failure analysis; Data keeping; Maintenance and Monitoring

Fundamentals of directional drilling, motors, bent housings and rotary steerable systems; Measurement while drilling tools surveys, and logging while drilling tools; Nuances of directional drilling; stick slip, dogleg severity and ellipses of uncertainty; Well planning and 'Geo-Steering'; Landing intermediate casing, and extrapolating to the bit, then drilling out; Class and team example wells - with post well review and perforation discussion

Introduction to artificial lift and electrical submersible pumping; Introduction for reservoir and production considerations; Description of all components of the electrical submersible system starting at the surface to the pump; transformers; controllers/VSD; wellhead; tubing cable; cable guards; motor lead cable; pump; intake/gas separator; equalizer/protector; motor; instrumentation; Installation considerations and cautions; Design of an ESP system to fit current and future well conditions; Operation of a given design; Analysis of an ESP system using diagnostics from installed instrumentation and using diagnostic computer programs; Removal of failed equipment; Controls for ESP systems including variable speed drives; ESP instrumentation available in the industry; Failure analysis; Data keeping; Maintenance and Monitoring

Fundamentals of directional drilling, motors, bent housings and rotary steerable systems; Measurement while drilling tools surveys, and logging while drilling tools; Nuances of directional drilling; stick slip, dogleg severity and ellipses of uncertainty; Well planning and 'Geo-Steering'; Landing intermediate casing, and extrapolating to the bit, then drilling out; Class and team example wells - with post well review and perforation discussion

Additional information

Expenses

Cost Management - CM

Price on request