Materials Processing and Finishing Level 3

NVQ

In Belfast City

Price on request

Description

  • Type

    NVQ

  • Location

    Belfast city (Northern Ireland)

To gain knowledge and skills on Materials Processing and Finishing Level 3. Suitable for anyone interested in materials processing and finishing level 3.

Facilities

Location

Start date

Belfast City (County Antrim)
See map
Interpoint 20-24 York Street, BT15 1AQ

Start date

On request

Questions & Answers

Add your question

Our advisors and other users will be able to reply to you

Who would you like to address this question to?

Fill in your details to get a reply

We will only publish your name and question

Reviews

Course programme

Mandatory Units for all Pathways

  • Unit 1: Complying with Statutory Regulations and Organisational Safety Requirements
  • Unit 2: Using and Interpreting Engineering Drawings and Documentation
  • Unit 3: Working Efficiently and Effectively in Engineering

Pathways

Moulding & Coremaking
Must complete one unit from the following:

  • Unit 4: Producing Sand Moulds using Loose Patterns Manually
  • Unit 5: Producing Sand Moulds using Plated Patterns
  • Unit 6: Producing Sand Cores Manually

Plus two more units from the following:

  • Unit 7: Locating, Assembling and Core Setting in Sand Moulds
  • Unit 8: Forming Runner, Riser and Feeder Systems in Sand Moulds
  • Unit 9: Closing and Securing Sand Moulds for Casting
  • Unit 10: Assembling Cores to Form Complete Moulds
  • Unit 11: Assembling Cores using Jigs and Fixtures

Casting Inspection
Must complete any three units from the following:

  • Unit 12: Proof Inspection of Sample Castings
  • Unit 13: Final Inspection of Castings
  • Unit 14: Inspecting Castings using Coordinate Measuring Methods (CMM)
  • Unit 15: Inspecting Castings by Magnetic Particle Testing Methods
  • Unit 16: Inspecting Castings using Penetrant Flaw Detection Techniques
  • Unit 17: Preparing Ultrasonic Flaw Detection Equipment for Testing Activities
  • Unit 18: Inspecting Castings using Ultrasonic Testing Techniques
  • Unit 19: Preparing Work areas for Radiographic Testing of Castings
  • Unit 20: Carrying out Radiographic Testing Activities on Castings
  • Unit 21: Analysing and Interpreting the Results of Radiographic Tests on Castings

Pressure Die Casting
Must complete any three Units from the following:

  • Unit 22: Setting Pressure Die Casting Machines for Production
  • Unit 23: Producing Sample / Trial Castings using a Pressure Die Process
  • Unit 24: Producing Castings using a Pressure Die Process
  • Unit 25: Maintaining Pressure Die Casting Machine Performance

Surface Finishing
Must complete two units from the following

  • Unit 26: Finishing Materials by Applying Liquid Coatings by Dipping
  • Unit 27: Finishing Materials by Applying Liquid Coatings by Spray Methods
  • Unit 28: Applying Industrial Coatings by Electro / Autophoretic Methods
  • Unit 29: Finishing Materials by Applying Powder Coatings
  • Unit 30: Finishing Materials by Applying Hot Dip Treatments
  • Unit 31: Finishing Materials by Electro Plating Methods
  • Unit 32: Finishing Materials by Applying Coatings by Electroless Nickel Plating
  • Unit 33: Finishing Materials by Chemical Conversion Processes
  • Unit 34: Finishing Materials by Sulphuric Acid Anodising
  • Unit 35: Finishing Materials by Chromic Acid Anodising
  • Unit 36: Finishing Materials by Hard Anodising
  • Unit 37: Finishing Materials by Mechanical Plating
  • Unit 38: Finishing Materials by Chemical and Electro Chemical Polishing Processes
  • Unit 39: Finishing Materials by Physical and Chemical Vapour Deposition
  • Unit 40: Finishing Materials by Alloying Plating Processes
  • Unit 41: Finishing Materials by Phosphating
  • Unit 42: Finishing Materials by Zinc Plating
  • Unit 43: Finishing Materials with Zinc-Rich Coatings
  • Unit 44: Finishing Materials by Nickel and Chromium Plating
  • Unit 45: Finishing Materials by Hard Chromium Plating
  • Unit 46: Finishing Materials by Mechanical Polishing
  • Unit 47: Finishing Components by Applying Transfers, Decals and Livery
  • Unit 48: Preparing Thermal Spraying Equipment for Operation
  • Unit 49: Carrying out Thermal Spraying Activities

Composite Manufacture
Must complete one of the following units:

  • Unit 50: Producing Composite Mouldings using Pre-Preg Laminating Techniques
  • Unit 51: Producing Composite Mouldings using Wet Lay-up Techniques
  • Unit 52: Producing Composite Assemblies
  • Unit 53: Producing Components by Vacuum Forming
  • Unit 54: Producing Components by Acrylic Moulding

Plus one more unit from the following: Or one more unit from above:

  • Unit 55: Bonding Composite Mouldings
  • Unit 56: Repairing Composite Mouldings
  • Unit 57: Trimming Composite Mouldings using hand Tools
  • Unit 58: Identifying Defects in Composite Mouldings
  • Unit 59: Applying Finishes to Composite Mouldings

Plastic Injection Moulding
Must complete two of the following units:

  • Unit 60: Setting Plastic Injection Moulding Machines for Production
  • Unit 61: Producing Components using Plastic Injection Moulding Machines
  • Unit 62: Handing Over Plastic Injection Moulding Machines to Production Operators

Heat Treatment
Must complete both of the following units

  • Unit 63: Preparing Materials Before and After Heat Treatment Activities
  • Unit 64: Heat Treating Materials for Manufacturing Activities

Materials Processing and Finishing Level 3

Price on request