-
All
-
Online
-
Filters
Operator Tickets courses
-
I had 1 to 1 intense 6 day course. Learned to much and enjoyed every minute and passed easier than I thought because I picked up how to use the machine, it gets easier when you know what you’re doing!
← | →
-
Highly recommend. Bamct are by a long way the best training provider I have used.
← | →
- Short course
- Inhouse
...To apply for this test at the test centre you must have a current Health & Safety test (within the last 2 years) to be able to sit the tests...
...To apply for this test at the test centre you must have a current Health & Safety test (within the last 2 years) to be able to sit the tests...
-
I had 1 to 1 intense 6 day course. Learned to much and enjoyed every minute and passed easier than I thought because I picked up how to use the machine, it gets easier when you know what you’re doing!
← | → see all
-
Highly recommend. Bamct are by a long way the best training provider I have used.
← | → see all
- Short course
- Inhouse
...The pass mark is 80% and the duration of this test is 1 hour 15 minutes (maximum). Part Two Is the practical element of the test. The test centre...
- Short course
- Inhouse
- 1 Day
...potentially dangerous construction sites really are. An accident by the nature of its word is just an accident, as employers/employees we all have a basic...
- Short course
- Inhouse
...To gain knowledge and skills on the correct and safe way to change cutting or grinding disks, and ensuring the machines are safe to use. Suitable for anyone...
- Short course
- Inhouse
...range of safety awareness courses to suit different needs through out the construction industry. Health & Safety at Work Act Abrasive Wheels Manual Handling...
- Short course
- Inhouse
...To awaken people's views on how their hearing actually affects their every day lives, including their social lives. Suitable for anyone interested. For anyone interested...
- Short course
- Inhouse
...Delivering materials to construction sites? Most Construction sites today are insistent that the driver/operator holds a current CPCS card to operate lorry...
- Short course
- Inhouse
...and you must respond correctly. The pass mark is 80% and the duration of this test is 1 hour 15 minutes (maximum). Part Two Is the practical element of the...
- Short course
- Inhouse
...Concrete Pump Trailer Mounted – 1 hour 30 minutes (maximum)...
- NVQ
- Inhouse
...Not got the experience! If you have not got the required experience don’t worry, at Operator Tickets Ltd we are here to help you. We at Operators Tickets...
- Short course
- Inhouse
...Remember to turn your Red CPCS card Blue you will require to complete an NVQ for the category on the card Where can I take a test? Provided your workplace...
- NVQ
- Inhouse
...steps Make sure you are fully qualified to operate your Piling machine Your future may depend on it! Remember to turn your Red CPCS card Blue you...
- Short course
- Inhouse
...and you must respond correctly. The pass mark is 80% and the duration of this test is 1 hour 15 minutes (maximum). Part Two Is the practical element of the...
- Short course
- Inhouse
...centre you must have a current Health & Safety test (within the last 2 years) to be able to sit the tests Part One Is a professional discussion on a one to one basis...
- NVQ
- Inhouse
...CITB are an organization committed to building a national framework of construction scheme plant National Vocational Qualification (NVQ) trained and competent personnel...
- Short course
- Inhouse
...above and below 15 tonnes Piling Rigs (Driven) below 15 tonnes Forward Tipping Dump Trucks training 360* Excavators all sizes Telehandler Forklift Truck...
Questions & Answers
Add your question
Our advisors and other users will be able to reply to you