PetroSync - Drilling Problems & Drilling Optimization

Training

Online

£ 2,394.07 + VAT

*Indicative price

Original amount in USD:

$ 2,995

Description

  • Type

    Training

  • Level

    Intermediate

  • Methodology

    Online

  • Duration

    5 Days

  • Virtual classes

    Yes

This course introduces various types of problems that could be encountered during drilling and workover operations and result in non-productive and very costly drilling down time as well as the possible means for reduction of this time throughout adequate definition and monitoring of KPI’s, data management, quantifying uncertainties in the subsurface conditions, risk assessment and use of modern drilling technologies and trends. Moreover, the course provides better understanding, enhance knowledge and strengthen the decision-making capability of the participants to enhance the well perfomance throughout presentations, case studies, group discussions and exercise as well as practical videos of actual cases.

Important information

Documents

  • PetroSync_-_Drilling_Problems_&_Drilling_Optimization_VIRTUAL_TRAINING_2021.pdf

About this course

- What potential problem may occur during drilling?
- Why do these problems occur?
- What to do and how to act quickly to minimize its economic impact on the drilling budget?
- Learn how to recognize signs before problems it become eminent to help in reducing the rig downtime and cost accordingly.
- Recognize the influence of drill string and reservoir mechanics.
- Identify possible and expected operational problems and contingency plans.
- Acquire necessary skills to conduct risk assessment for all phases of the process to minimize the down time or losses.
- Understand how to avoid drilling problems and implement well control procedures throughout operations.
- Appreciate the environmental effects of drilling activities.
- Implement techniques to control non-productive time.

- Drilling Engineers
- Petroleum Engineers
- Drilling Managers
- Tool Pushers
- Reservoir Engineers
- Risk Managers
- Field Services Staff
- Drillers

Questions & Answers

Add your question

Our advisors and other users will be able to reply to you

Who would you like to address this question to?

Fill in your details to get a reply

We will only publish your name and question

Reviews

Subjects

  • Drilling
  • Reservoir
  • Drilling Engineers
  • Reservoir Engineers
  • Petroleum
  • Petroleum Engineering
  • Risk Managers
  • Drilling Managers
  • Field Services
  • Drillers
  • Drilling Rig
  • Drilling Fluids
  • Drilling Bits
  • Geology
  • Seismic
  • Production
  • Training
  • Formation damage
  • Completion
  • Well Completion

Teachers and trainers (1)

Magdi El Naggar Magdi El Naggar

Magdi El Naggar Magdi El Naggar

Managing Director at Oil Fields Global Consultants (OFGC)

Magdi El Naggar is officially Certified as Professional Petroleum Engineering Consultants (License 116/7). He has 46 years of professional experience n various phases of Petroleum Engineering including Petroleum/Reservoir/Production/Drilling & Workover Engineering as well as field operations with several multi-national international companies including ARAMCO (Saudi Arabia) and ADNOC (UAE). He has extensive professional experiences in all phases of well intervention operations including coiled tubing, especially during well emergency cases, well control and extended reach operations.

Course programme

  • Drilling Rigs
  • Drilling Fluids
  • Drilling Bits
  • Casing
  • Cementing
  • Extended Reach Drilling
  • Drilling Fluids Additives
  • Drill String Components
  • Directional Drilling Types and Applications
  • Extended Reach Drilling Challenges
  • Drilling Fluids Issues for Extended Reach Drilling
  • Selection Criteria of Drilling Fluids
  • Hole Cleaning

Additional information

For further information please klik this link https://www.petrosync.com/oil-gas-training/course/details/Drilling-Problems-&-Dirlling-Optimization/

or Contact Abraham at abraham.l@Petrosync.com / +65 3159 0800 and Please visit our website at https://www.petrosync.com/

PetroSync - Drilling Problems & Drilling Optimization

£ 2,394.07 + VAT

*Indicative price

Original amount in USD:

$ 2,995