PV Power Optimisation: how to maximise solar yield by up to 25%

Training

In London

Price on request

Description

  • Type

    Training

  • Location

    London

  • Class hours

    3h

Learn how to: Seminar Highlights: How to eliminate power losses due to module mismatch, dust and soiling, partial shading and more, for maximum power harvesting with the SolarEdge power optimizers. How to reduce maintenance cost with module-level monitoring and troubleshooting. How to optimize roof utilization with flexible design enabling connection of longer strings and modules on different roof facets to one inverter - UK case studies. How to minimize risk of electrocution for installers and firefighters with module safety shutdown. Suitable for: Photovoltaic system installers, distributors and contractors, property management companies and social housing landlords

Important information

Documents

  • Invitation
  • Oxford PV Case Study
  • Exeter PV Case Study

Facilities

Location

Start date

London
See map
Royal Victoria Dock, Western Gateway E16 1al

Start date

On request

Questions & Answers

Add your question

Our advisors and other users will be able to reply to you

Who would you like to address this question to?

Fill in your details to get a reply

We will only publish your name and question

Reviews

Course programme

Learn how to harvest up to 25% more energy from your PV installations

Join SolarEdge for a 3-hour seminar on its world-leading distributed power harvesting system. The SolarEdge unique solution enables maximum power harvesting and faster return on investment through optimization of each individual solar module, efficient DC/AC inversion and enhanced, module-level monitoring and maintenance.


Seminar Highlights:
• How to eliminate power losses due to module mismatch, dust and soiling, partial shading and more, for maximum power harvesting with the SolarEdge power optimizers
• How to reduce maintenance cost with module-level monitoring and troubleshooting
• How to optimize roof utilization with flexible design enabling connection of longer strings and modules on different roof facets to one inverter – UK case studies
• How to minimize risk of electrocution for installers and firefighters with module safety shutdown

When:
March 1, 2011 in two sessions:
• Morning session: 09:00 - 09:30 – gathering and registration; 09:30-12:30 – seminar
• Afternoon session: 13:30-14:00 – gathering and registration; 14:00-17:00 – seminar

Where:
Crowne Plaza London Docklands
Royal Victoria Dock, Western Gateway
E16 1AL, London, UK (Royal Victoria Station)

Who should attend:
Photovoltaic system installers, distributors and contractors, property management companies and social housing landlords.

Reserve your seat soon – limited space is available for each session.

<

PV Power Optimisation: how to maximise solar yield by up to 25%

Price on request