Solids Control Systems - SCS

Course

In San Francisco (USA)

Price on request

Description

  • Type

    Course

  • Location

    San francisco (USA)

  • Start date

    Different dates available

Basic well completion design, practices, and strategies; Well quality and integrity; Safety aspects of well design; Packer selection and tubing forces; Wellheads/chokes/ subsurface safety valves and flow control equipment; Corrosion and erosion Inflow and tubing performance; Tubing design and selection; Materials selection; Deviated/multiple zone/subsea horizontal/multilateral and hpht completion considerations; Perforating design; Causes and prevention of formation damage; Stimulation design considerations; Sand control; Wireline/coiled tubing/workover rig operations; Snubbing

Facilities

Location

Start date

San Francisco (USA)
See map
333 Bush Street, Suite 2400, 94104

Start date

Different dates availableEnrolment now open

Questions & Answers

Add your question

Our advisors and other users will be able to reply to you

Who would you like to address this question to?

Fill in your details to get a reply

We will only publish your name and question

Reviews

Subjects

  • Design
  • Basic IT training
  • Quality Training
  • Basic IT
  • Materials
  • Basic
  • Performance
  • Quality
  • Systems

Course programme

Training Course Content

Basic well completion design, practices, and strategies; Well quality and integrity; Safety aspects of well design; Packer selection and tubing forces; Wellheads/chokes/ subsurface safety valves and flow control equipment; Corrosion and erosion Inflow and tubing performance; Tubing design and selection; Materials selection; Deviated/multiple zone/subsea horizontal/multilateral and hpht completion considerations; Perforating design; Causes and prevention of formation damage; Stimulation design considerations; Sand control; Wireline/coiled tubing/workover rig operations; Snubbing

Explore the characteristics of change; Build an integrated change strategy; Embrace change positively using the power of vision; Use people and process to make change happen; Craft an effective measurement process to evaluate change; Facilitate change and overcome resistance through effective communication

Basic well completion design, practices, and strategies; Well quality and integrity; Safety aspects of well design; Packer selection and tubing forces; Wellheads/chokes/ subsurface safety valves and flow control equipment; Corrosion and erosion Inflow and tubing performance; Tubing design and selection; Materials selection; Deviated/multiple zone/subsea horizontal/multilateral and hpht completion considerations; Perforating design; Causes and prevention of formation damage; Stimulation design considerations; Sand control; Wireline/coiled tubing/workover rig operations; Snubbing

Explore the characteristics of change; Build an integrated change strategy; Embrace change positively using the power of vision; Use people and process to make change happen; Craft an effective measurement process to evaluate change; Facilitate change and overcome resistance through effective communication

Additional information

Expenses

Solids Control Systems - SCS

Price on request