Aeronautical Engineering Level 3

NVQ

In Belfast City

Price on request

Description

  • Type

    NVQ

  • Location

    Belfast city (Northern Ireland)

To gain knowledge and skills on Aeronautical Engineering Level 3. Suitable for anyone interested in aeronautical engineering level 3.

Facilities

Location

Start date

Belfast City (County Antrim)
See map
Interpoint 20-24 York Street, BT15 1AQ

Start date

On request

Questions & Answers

Add your question

Our advisors and other users will be able to reply to you

Who would you like to address this question to?

Fill in your details to get a reply

We will only publish your name and question

Reviews

Course programme

Mandatory Units
Must complete all of the following units, plus the relevant units for the chosen pathway

  • Unit 1: Complying with Statutory Regulations and Organisational Safety Requirements
  • Unit 2: Using and Interpreting Engineering Drawings and Documents
  • Unit 3: Working Efficiently and Effectively in Engineering
  • Unit 4: Reinstating the Work Area on Completion of Activities

Pathways (One pathway must be covered)

Aircraft Detail Fitting
Must complete four units from the following:

  • Unit 5: Marking Out Aircraft Components
  • Unit 6: Cutting and Shaping Aircraft Components
  • Unit 7: Bending and Forming Aircraft Components
  • Unit 8: Installing Aircraft Mechanical Fasteners
  • Unit 9: Producing Aircraft Detail Assemblies

Airframe Fitting
Must complete three units from the following:

  • Unit 8: Installing Aircraft Mechanical Fasteners
  • Unit 10: Producing Aircraft Sub-assemblies
  • Unit 11: Producing Aircraft Major Assemblies
  • Unit 12: Installing Aircraft Mechanical Controls
  • Unit 13: Repairing Airframes and Structures
  • Unit 14: Modifying Airframes
  • Unit 15: Modifying Aircraft Mechanical Systems
  • Unit 16: Carrying Out Routine Servicing of Aircraft
  • Unit 26: Producing Aircraft Composite Assemblies

Installing Aircraft Interiors
Must complete three units from the following:

  • Unit 17: Installing Aircraft Domestic Equipment
  • Unit 18: Installing Aircraft Lockers and Storage Units
  • Unit 19: Installing Aircraft Interior Panels and Soft Furnishings
  • Unit 20: Installing Aircraft Seating and Furniture
  • Unit 21: Cutting and Shaping Soft Furnishing Materials

Composite / Transparency Manufacture
Must complete three units from the following:

  • Unit 22: Moulding Aircraft Fibre Reinforced Plastic (FRP) Components
  • Unit 23: Moulding Acrylic Aircraft Components
  • Unit 24: Producing Aircraft Components from Carbon Fibre
  • Unit 25: Producing Aircraft Components from Glass Fibre
  • Unit 26: Producing Aircraft Composite Assemblies
  • Unit 27: Vacuum Forming Aircraft Components
  • Unit 28: Injection Moulding Aircraft Components
  • Unit 29: Joining Aircraft Components by Adhesive Bonding
  • Unit 30: Assembling Aircraft Transparencies

Power Plant Assembly and Testing
Must complete one unit from the following:

  • Unit 31: Producing Aircraft Engine Compressor Assemblies
  • Unit 32: Producing Aircraft Engine Combustion Assemblies
  • Unit 33: Producing Aircraft Engine Turbine Assemblies
  • Unit 34: Producing Aircraft Engine Gearbox Assemblies
  • Unit 35: Producing Aircraft Piston Engine Assemblies
  • Unit 36: Producing Aircraft Engine Major Assemblies
  • Unit 37: Dressing Aircraft Engines
  • Unit 38: Carrying out Uninstalled Aircraft Engine Testing Procedures

Aircraft Mechanical Systems Installation
Must complete two units from the following:

  • Unit 12: Installing Aircraft Mechanical Controls
  • Unit 41: Installing Aircraft Hydraulic Systems
  • Unit 42: Installing Aircraft Pneumatic Systems
  • Unit 43: Installing Aircraft De-icing Systems
  • Unit 44: Installing Aircraft Fuel Systems
  • Unit 45: Installing Aircraft Environmental Systems
  • Unit 46: Installing Flying Control Surfaces and Systems
  • Unit 47: Installing Aircraft Armament Systems
  • Unit 48: Installing Aircraft Assisted Escape Mechanisms
  • Unit 49: Installing Aircraft Main Engines
  • Unit 50: Installing Aircraft Auxiliary Engines
  • Unit 51: Installing Aircraft Power Transmission Systems

Testing Aircraft Mechanical Systems
Must complete two units from the following:

  • Unit 52: Testing Installed Aircraft Engines
  • Unit 53: Testing Aircraft Power Transmission Systems
  • Unit 54: Testing Aircraft Hydraulic Systems
  • Unit 55: Testing Aircraft Pneumatic Systems
  • Unit 56: Testing Aircraft Environmental Systems
  • Unit 57: Testing Aircraft De-icing Systems
  • Unit 58: Testing Aircraft Fuel Systems
  • Unit 59: Testing Aircraft Flying Control Surfaces and Systems
  • Unit 60: Testing Aircraft Armament Systems
  • Unit 61: Testing Aircraft Assisted Escape Systems

Electrical and Electronic Avionics Systems Installation
Must complete three of the following units:

  • Unit 62: Installing Aircraft Cableforms/Looms
  • Unit 63: Installing Aircraft Instrument Panels and Meters
  • Unit 64: Installing Aircraft Visual Display Units and Computer Systems
  • Unit 65: Installing Aircraft Engine Control Units
  • Unit 66: Installing Aircraft Power Supplies
  • Unit 67: Installing Aircraft Communication Systems
  • Unit 68: Installing Aircraft Flight Guidance and Control Systems
  • Unit 69: Installing Aircraft Navigational Systems
  • Unit 70: Installing Aircraft Radar Systems
  • Unit 71: Installing Aircraft Countermeasure Systems
  • Unit 72: Installing Aircraft Electro-Optical and Infrared Systems
  • Unit 73: Installing Aircraft Instrumentation Systems
  • Unit 74: Modifying Aircraft Electrical Systems
  • Unit 75: Modifying Aircraft Avionics Systems

Plus three more units from the following:

  • Unit 76: Testing Aircraft Cableforms/Looms
  • Unit 77: Testing Aircraft Visual Display Units and Computer Systems
  • Unit 78: Testing Aircraft Engine Control Units
  • Unit 79: Testing Aircraft Communication Systems
  • Unit 80: Testing Aircraft Flight Guidance and Control Systems
  • Unit 81: Testing Aircraft Navigational Systems
  • Unit 82: Testing Aircraft Radar Systems
  • Unit 83: Testing Aircraft Countermeasure Systems
  • Unit 84: Testing Aircraft Electro-Optical and Infrared Systems
  • Unit 85: Testing Aircraft Instrumentation Systems

Manufacturing Aircraft Wire Looms
Must complete two of the following units

  • Unit 86: Producing Aircraft Wiring Layouts and Routeings
  • Unit 87: Producing Aircraft Electrical Sub-assemblies, Cableforms and Looms
  • Unit 88: Modifying Aircraft Cableforms and Looms

Aircraft Surface Finishing
Must complete three of the following units:

  • Unit 89: Applying Aircraft Paint Finishes by Hand
  • Unit 90: Applying Aircraft paint Finishes by Spray Guns
  • Unit 91: Applying Transfers, Decals and Livery to Aircraft
  • Unit 92: Stripping and Removing Aircraft Finishes
  • Unit 93: Applying Finishes to Composite Mouldings

Survival Equipment Maintenance
Must complete five of the following units:

  • Unit 94: Carrying Out Maintenance of Aircrew Protective Helmets and Electrical Headsets
  • Unit 95: Carrying Out Maintenance of Aircrew Protective Clothing
  • Unit 96: Carrying Out Maintenance of Aircrew Nuclear, Biological and Chemical (NBC) Respirators and Equipment
  • Unit 97: Carrying Out Maintenance of Aircrew Life Preserver Equipment
  • Unit 98: Carrying Out Maintenance of Aircrew Inertia Reels and Restraint Harnesses
  • Unit 99: Carrying Out Maintenance of Aircraft Multi-Seat Life Rafts and Emergency Packs
  • Unit 100: Carrying Out Maintenance of Aircrew Oxygen Masks
  • Unit 101: Carrying Out Maintenance of Aircrew Personal Survival Packs (PSP)
  • Unit 102: Carrying Out Maintenance of Aircrew Quick Release Fasteners (QRF)
  • Unit 103: Carrying Out Maintenance of Parachute Assemblies

Weapons Maintenance
Must complete four units, as follows:
Two units from the following:

  • Unit 104: Testing Uninstalled Aircraft Assisted Escape System (AAES) Components
  • Unit 105: Testing Installed Aircraft Armament Systems
  • Unit 106: Testing Uninstalled Aircraft Armament System Components
  • Unit 107: Undertaking Fault Diagnosis on Installed Aircraft Armament Systems
  • Unit 108: Undertaking Fault Diagnosis on Uninstalled Aircraft Armament System Components
  • Unit 109: Modifying Aircraft Armament Systems and Components
  • Unit 110: Testing Installed Aircraft Assisted Escape Systems (AAES)

Plus EITHER:
Two units from the following:

  • Unit 111: Overhauling Aircraft Gun Systems
  • Unit 112: Overhauling Aircraft Assisted Escape Systems (AAES)
  • Unit 113: Overhauling Aircraft Armament Release Systems

OR:

One unit from the following:

  • Unit 114: Removing Aircraft Armament System Components
  • Unit 115: Removing Aircraft Assisted Escape Systems (AAES)
  • Unit 116: Removing Aircraft Armament Expendable Stores

And one unit from the following:

  • Unit 117: Installing Aircraft Armament System Components
  • Unit 118: Installing Aircraft Assisted Escape Systems (AAES)
  • Unit 119: Installing Aircraft Armament Expendable Stores

Additional Units
The following unit may be used in any relevant pathway but must be additional to the requirements identified for the Pathway.

  • Unit 39: Drilling and Finishing Holes in Aircraft Structures or Components

Aeronautical Engineering Level 3

Price on request