-
All
-
Online
-
Filters
-
Location
-
Online
-
Type of studies
-
+ Filters
Puwer loler courses
- Training
- London
- 1 Day
...The course outlines the necessary standards to comply with the legislation: The Provision and Use of Work Equipment Regulations 1998 (PUWER) and the Lift Operations and Lift Equipment Regulations. 1998 (LOLER). It includes guidance on safety of machinery and related parts of control and guarding...
- Training
- Telford
- 1 Day
.... Lifting Operations & Lifting Equipment Regulations. Planning. Risk Management. Supervision. The main requirements of the LOLER including: Installing lifting...
-
Instructor was informative and they enjoyed a lot, I had a nice time.
← | →
-
The facilities were good, staff is also brilliant and I had a nice time in all.
← | →
-
Paul was great and I had a nice time, the course was excellent and I had a nice time.
← | →
- Training
- Blended in Liverpool
- 1 Day
..., European, HASWA, PUWER, LOLER, MHSW, WAHR & RIDDOR. 5. PRE-USE INSPECTIONS/HANDOVERS Thorough examinations, Familiarisation, Pre-Use Inspection, Identify...
..., European, HASWA, PUWER, LOLER, MHSW, WAHR & RIDDOR. 5. PRE-USE INSPECTIONS/HANDOVERS Thorough examinations, Familiarisation, Pre-Use Inspection, Identify...
-
Instructor was informative and they enjoyed a lot, I had a nice time.
← | → see all
-
The facilities were good, staff is also brilliant and I had a nice time in all.
← | → see all
-
Paul was great and I had a nice time, the course was excellent and I had a nice time.
← | → see all
- Training
- Poole
- 3 Days
... of the Crane Supervisor / Appointed Person Preparing an area, with exclusion zones End test [LOLER] and [PUWER] Training Methods: Practical Aspect Classroom...
- Course
- Chesterfield
- 2 Days
... • Hazardous Substances • LOLER • PUWER • Electricity • Isolation • Hand-Arm Vibration • Noise 1 day renewal course is also available...
- Course
- Hull
- 2 Days
... – Working at Heights – Fire Risk Control – Site Vehicles. Day 2 Session 3 - Safe Systems of Work. PUWER – LOLER – Electricity – Energy and Hazard Isolation...
- Short course
- (Nationwide)
- Beginner
- Different dates available
- 1 Day
... training to inform candidates of the relevant legislation / statutory requirements (HASWA 1974, MHOR 92, PUWER 98, LOLER 98 etc), raise awareness of... Learn about: Manual Handling, Lifting and handling, Health and Safety...
- Short course
- Coventry
... and the need for safety training. The course covers PUWER¹ and LOLER², Health and Safety at Work Act. Construction Welfare, EN Product Standards and Personal...
- Short course
- Stonehouse
- Advanced
- 1 Day
... The Environment Safe Lifting & Manual Handling (Video) Session Three SAFE SYSTEMS OF WORK Asbestos and Hazardous Substances Personnel Hygiene LOLER & PUWER...
- Course
- Stockton-on-Tees
- 6h
... & manual handling • Safe Systems of Work – Asbestos & hazardous substance, personal hygiene, LOLER & PUWER, electricity, machinery/equipment isolation, hand...
- Course
- Inhouse
- 2 Days
... substances LOLER PUWER Electricity Hand/Arm Vibration Noise...
- Course
- London
... Issue 2, LOLER & PUWER regulations. Define the term Duty Holder and Competent Person Give reasons for Altering Periods of Inspection...
- Short course
- Kidderminster
- 1 Day
...Delegates will be able to state the length of time ladders should be used for, identify the heirarchy of control for working at height and the main factors leading to falls from height; understand how legislation (LOLER, PUWER & Management of Health & Safety Regulations) apply to working at height...
- Training
- Poole
- 3 Days
...Course Content: Health and Safety Regulations / The Lifting Operations and Lifting Equipment Regulations [LOLER] 1998 Planning the lift -...
- Short course
- Chesterfield
- 1 Day
... statements. • Weight Estimation and Fault Analysis. • Lifting Operation and Lifting Equipment Regulations (LOLER) • Work Equipment Regulations. (PUWER...
- Short course
- Leeds
- 1 Day
...Introductions Objectives HASAW 1974 – Health and Safety at Work Act of 1974 LOLER 98 – Lifting Operations Lifting Equipment Regulations 0f 1998 PUWER...
- Course
- Rotherham
- 3 Days
.... *Planning of lifts. *Delegation of duties *Risk assessment/method statements *Safe working practices. Course Content *Legislation (LOLER & PUWER...
- Short course
- Carlisleandanother venue.
- 1 Day
...It is designed to help employers fulfill their legal obligations under PUWER and LOLER. On completion of the course candidates will understand legal obligations and safe systems of working with overhead cranes. This course does not replace the requirement for practical training with the equipment...
- Course
- Stonehouse
- 5 Days
... Regulations (WAHR) • Management of Contractors • Electricity at Work - Permits to work • PUWER • LOLER • Fire Precautions and Risk Assessments • Exercise 2...
- Course
- Jarrow
- Beginner
- 4 Days
...Overview On completion of this course, the candidate will have a clear understanding of appropriate regulations (LOLER, PUWER) and be...
Questions & Answers
Add your question
Our advisors and other users will be able to reply to you