Risk Management For Upstream Capital Projects - PMRM

Course

In San Francisco (USA)

Price on request

Description

  • Type

    Course

  • Location

    San francisco (USA)

  • Start date

    Different dates available

The overall drilling process and equipment; The language of drillers - understanding their terminology; Understanding the abbreviations and acronyms associated with drilling; Rig equipment and types; Types of drill bits; MWD; Drill strings; Drilled solids management; Mud tank arrangements; Drilling fluid properties; Well control; Cementing; Casing design; Hole problems (stuck pipe, lost circulation); Well control; Directional drilling operations and tools; Safety

Facilities

Location

Start date

San Francisco (USA)
See map
333 Bush Street, Suite 2400, 94104

Start date

Different dates availableEnrolment now open

Questions & Answers

Add your question

Our advisors and other users will be able to reply to you

Who would you like to address this question to?

Fill in your details to get a reply

We will only publish your name and question

Reviews

Subjects

  • Design
  • Management
  • IT Management
  • Gas
  • Systems
  • Business Plan
  • Basic IT
  • Heat Transfer
  • Basic IT training
  • IT Development
  • Refrigeration
  • Basic
  • Project
  • Risk Management
  • IT risk
  • Risk

Course programme

Training Course Content

The overall drilling process and equipment; The language of drillers - understanding their terminology; Understanding the abbreviations and acronyms associated with drilling; Rig equipment and types; Types of drill bits; MWD; Drill strings; Drilled solids management; Mud tank arrangements; Drilling fluid properties; Well control; Cementing; Casing design; Hole problems (stuck pipe, lost circulation); Well control; Directional drilling operations and tools; Safety

Gas Processing Systems; Physical Properties of Hydrocarbons; Qualitative Phase Behavior; Vapor-Liquid Equilibrium; Water-Hydrocarbon Behavior; Basic Thermodynamic Concepts and System Energy Changes; Relief and Flare Systems; Fluid Hydraulics; Separators; Heat Transfer; Pumps; Compressors; Refrigeration / NGL Extraction; Fractionation / Distillation; Glycol Dehydration; Adsorption Dehydration; Sour Gas Treating and Sulfur Recovery

Recognize and assess opportunities; Acquire exploration rights; Generate exploration prospect; Drill and evaluate exploration well; Establish commerciality; Create asset business plan; Characterize asset; Initiate facility design and sanction development project; Design, construct and commission facilities; Produce asset; Exploit asset; Dispose or decommission asset

The overall drilling process and equipment; The language of drillers - understanding their terminology; Understanding the abbreviations and acronyms associated with drilling; Rig equipment and types; Types of drill bits; MWD; Drill strings; Drilled solids management; Mud tank arrangements; Drilling fluid properties; Well control; Cementing; Casing design; Hole problems (stuck pipe, lost circulation); Well control; Directional drilling operations and tools; Safety

Gas Processing Systems; Physical Properties of Hydrocarbons; Qualitative Phase Behavior; Vapor-Liquid Equilibrium; Water-Hydrocarbon Behavior; Basic Thermodynamic Concepts and System Energy Changes; Relief and Flare Systems; Fluid Hydraulics; Separators; Heat Transfer; Pumps; Compressors; Refrigeration / NGL Extraction; Fractionation / Distillation; Glycol Dehydration; Adsorption Dehydration; Sour Gas Treating and Sulfur Recovery

Recognize and assess opportunities; Acquire exploration rights; Generate exploration prospect; Drill and evaluate exploration well; Establish commerciality; Create asset business plan; Characterize asset; Initiate facility design and sanction development project; Design, construct and commission facilities; Produce asset; Exploit asset; Dispose or decommission asset

The overall drilling process and equipment; The language of drillers - understanding their terminology; Understanding the abbreviations and acronyms associated with drilling; Rig equipment and types; Types of drill bits; MWD; Drill strings; Drilled solids management; Mud tank arrangements; Drilling fluid properties; Well control; Cementing; Casing design; Hole problems (stuck pipe, lost circulation); Well control; Directional drilling operations and tools; Safety

Gas Processing Systems; Physical Properties of Hydrocarbons; Qualitative Phase Behavior; Vapor-Liquid Equilibrium; Water-Hydrocarbon Behavior; Basic Thermodynamic Concepts and System Energy Changes; Relief and Flare Systems; Fluid Hydraulics; Separators; Heat Transfer; Pumps; Compressors; Refrigeration / NGL Extraction; Fractionation / Distillation; Glycol Dehydration; Adsorption Dehydration; Sour Gas Treating and Sulfur Recovery

Recognize and assess opportunities; Acquire exploration rights; Generate exploration prospect; Drill and evaluate exploration well; Establish commerciality; Create asset business plan; Characterize asset; Initiate facility design and sanction development project; Design, construct and commission facilities; Produce asset; Exploit asset; Dispose or decommission asset

Additional information

Expenses

Risk Management For Upstream Capital Projects - PMRM

Price on request