-
All
-
Online
-
Filters
System scaffolding courses
-
Great clean friendly
← | →
- NVQ
- Liverpool
- 1 Year
... for the application of decorative/protective finishes, *Apply paint systems by brush and roller plus painter and decorator route, *Apply wall coverings to non-complex...
... for the application of decorative/protective finishes, *Apply paint systems by brush and roller plus painter and decorator route, *Apply wall coverings to non-complex...
-
Great clean friendly
← | →
- Training
- Wakefieldandanother venue.
- 1 Day
... Birdcage System scaffolds Mobile towers Fans Stair towers Loading bays Identifying scaffolding terminology. Use of ladders and steps on site. Reasons...
- Short course
- Inhouse
... system of work is required above the ground ranging from high elevated maintenance works to the safe rigging up and dismantling of large construction plant...
- Short course
- (Romford)
- 1 Day
... of temporary works systems. It covers the fundamental roles and responsibilities of all parties involved, together with clear and concise guidance...
- Course
- Suffolk
- 1 Year
... in Construction Unit CC1007K/S Scaffolding Unit CC1009K/S Prepare Surfaces Unit CC1010K/S Apply Paint Systems Unit CC1011K/S Specialist Decorative Finishes. Entry...
- Short course
- (Leamington Spa)
- 1 Day
... at height Scaffolding, tower scaffolding, ladders, roof work, fall arrest and fall protection, systems, nets and airbags The WAH Regulations application...
- Course
- Telford
- 10 Days
... or for managers with specific responsibilities with regard to this activity. Programme content: Legal system, civil/criminal law, powers of courts, tribunals...
- Vocational qualification
- Liverpool
- 1 Year
... to work areas *Prepare surfaces for the application of decorative/protective finishes *Apply paint systems by brush and roller *Apply wall coverings to...
- Course
- (Crumlin)
- Beginner
- 4 Days
... and Hazards q Scaffolding, Excavations, Demolition q Permits to work and Method Statements q Management Systems Course Duration: 4 days The Course Assessment... Learn about: Civil law, Criminal law, Construction Management...
- Short course
- Inhouse
- 1 Day
... at height Scaffolding, tower scaffolding, ladders, roof work, fall arrest and fall protection, systems, nets and airbags The WAH Regulations application...
- Course
- St Albans
- 2 Days
... System of Work Module 2 Workplace Safety Module 3 Fire Precautions and Procedures Module 4 Accidents and First Aid Module 5 Hazardous Substances Module...
- Vocational qualification
- Liverpool
- 1 Year
... systems by brush and roller, *Apply wall coverings to non-complex locations, *Produce decorative specialist paint finishes basic, *Maths, *English...
- Bachelor's degree
- Stevenage
- Different dates available
... a crucial role in ensuring that the electrical systems we all use comply with national standards of health and safety. Painting and decorating: Being... Learn about: Skills and Training, Construction Training...
- Training
- Knowsley
- 2 Days
... and bridging beams Various types of system scaffold How to carry out a scaffold inspection Scaffold tagging systems Scaffold inspection exercise Knowledge...
- Short course
- Inhouse in Chester
- 1 Day
... to selection of safe working practices, including hierarchy of controls Planned systems of work and competence of users...
- Vocational qualification
- Liverpool
- 1 Year
..., *Provide temporary protection to work areas, *Prepare surfaces for the application of decorative/protective finishes, *Apply paint systems by brush...
- Short course
- Essex
- 6 Weeks
.... The areas to be covered will include: Health & Safety / First Aid SSOW (safe system of work) Correct use of tools and electrical equipment Ordering, storing... Learn about: Domestic Drainage, Brickwork skills, Vernacular style...
- Course
- London
- 10 Days
...On completions of the course operatives will have an understanding of the statutory regulations, the knowledge and skill to be able to safely erect, as a member of a team, various scaffold structures. Suitable for: Candidates who have a minimum of 6 months experience within the scaffolding industry...